Active Estimating Identifies Potential Risks in Early Project Phases

Accurately identifying risk in the early phases of construction projects is pivotal to managing budgets, timelines, and client expectations. Through recent internal analysis and case reviews, Active Estimating has uncovered key risk indicators that emerge before subcontractor engagement, particularly during the budgeting and pre-bid stages. These findings emphasize the importance of early-stage visibility into labor metrics, scope clarity, and production feasibility.



Uncovering Scope Drift and Mismatched Assumptions


In-depth reviews of preconstruction documents have revealed how inconsistencies between budgetary assumptions and actual bid line item details can snowball into systemic project risk. One analysis demonstrated that a project initially scoped at 98,885 labor hours under budgeting parameters was ultimately bid at 123,035 labor hours — a 25% increase. This disconnect often stems from siloed estimating processes and a lack of dynamic labor unit benchmarking.





Key Indicators of Early Risk


Based on compiled project reviews and estimating trends, several recurring factors signal elevated early-phase risk:



  • Labor unit variance greater than 15% from historical benchmarks

  • Overreliance on unit averages without consideration for project-specific complexity

  • Manual entry or outdated spreadsheets driving takeoff assumptions

  • Delayed alignment between preconstruction and field operations teams



Data-Driven Intelligence in Risk Forecasting


Rather than relying solely on final bid reviews, Active Estimating leverages data-driven intelligence to analyze labor unit performance during the conceptual and schematic phases. This approach enables early identification of:



  • Scopes with productivity compression due to aggressive labor rates

  • Trades with misaligned scope coverage assumptions

  • Patterns of estimator overrides on risk-prone assemblies


For example, in the reviewed 425,000 sq. ft. scope, the budget allocated 27,500 labor hours to Exterior Framing. Upon bid finalization, that number escalated to 36,800 hours — a clear sign of underestimated risk factors such as weather exposure, sequencing inefficiencies, and material availability impacts.



Collaboration and Forecasting Alignment


Cross-departmental collaboration and real-time data review have proven vital in mitigating labor overruns. By comparing forecasted and actual labor hours at multiple design stages, estimating teams can apply rolling adjustments and improve bid accuracy. This iterative process enhances forecast integrity while reducing exposure to late-phase redesign costs or operational overruns.



Summary of Findings



  • Projects with >20% labor deviation from budget to bid should undergo additional review

  • Early alignment with operations teams helps detect hidden scope challenges

  • Benchmarking labor productivity across scopes reduces reliance on general assumptions

  • Transparent communication between estimation and operations narrows execution gaps



Conclusion


Proactive identification of labor variance and scope complexity indicators can significantly improve financial performance and stakeholder trust. By implementing refined labor metrics and phase-specific intelligence, firms can shift from reactive estimating to a predictive, controlled budgeting process.



For additional resources or to request a full whitepaper on this risk assessment methodology, contact the team below.



Contact Information



Active Estimating

508 2nd Street, Suite 208

Davis

California

95616



Rich Schoener

[email protected]

(877) 982-2848

https://www.activeestimating.com/drywall-estimating-software



Original Source


https://www.activeestimating.com/media-room

Leave a Reply

Your email address will not be published. Required fields are marked *